Our Production
Process
Recognizing the importance of high recovery, we are constantly investing in newer heavy duty precision woodworking machines made mainly from Germany and Taiwan.
Our Capacity
± 4.000 m3 per month for albasia barecore
± 1.000 m3 per month for pine FJLB
Saw Mill
Log processing become sawn timber.
Kiln Dry
Sawn timber drying process, this process takes around 11 days.
Base Moulding
There are 2 steps in this process. First step is Double Planner which is use to smoothen the surface top and bottom. Second Step is Multirip, to get S4S sticks (Smooth 4 surface top, bottom, left, and right side).
Cross Cut
Taking the grade from S4S sticks and removing live and death knots to Lamina process.
Finger Joint
Finger jointing of lamina after grade separation process.
Moulding
Flattening and smoothing process for 4 sides (top, bottom, left and right) and make S4S in finger joints ready for lamination process.
Cold Press and HF Press
Double End
Length sizing and flattening the ends.
Sanding
Wild Belt Sander 1300.
